DLR Control Network Reinstatement — TfL Stations

Triple Survey was appointed by Transport for London (TfL) to reinstate the Docklands Light Railway (DLR) survey control network after station construction displaced existing points. The scope covered Westferry, West Silvertown and King George V, delivering QA checks, coordinate verification and full witness diagrams for future re-establishment.

DLR survey control TfL infrastructure Witness diagrams QA checks
DLR survey control network reinstatement at TfL stations — Triple Survey

Project Overview

Survey control underpins every element of rail engineering. Following upgrades at three stations, we reinstated displaced control, tied new marks into the wider TfL network, and provided a traceable audit via witness diagrams and QA reports, ensuring reliability for future construction and maintenance.

  • Reinstated control at Westferry, West Silvertown, King George V.
  • Redundant observations and checks for network integrity.
  • Witness diagrams, coordinate schedules and AutoCAD drawings.
  • Compliant QA documentation to TfL standards.

At a Glance

  • Stations: Westferry, West Silvertown, King George V
  • Sector: Rail / Infrastructure
  • Services: Survey Control, QA, Witness Diagrams
  • Equipment: Leica TS16, Traverse Kit

Re-establishing Survey Control

We recovered and re-established survey control where original marks were disturbed or inaccessible, creating a resilient network with clear ties to permanent features and TfL references.

Re-establishing survey control on the Docklands Light Railway Re-establishing control with robust ties and checks.

Westferry Station

At Westferry, we reinstated control stations with redundancy measurements, issuing coordinate tables and sketches for rapid reoccupation.

Survey control reinstatement at Westferry DLR station Westferry: control reinstated and verified.

West Silvertown Station

At West Silvertown, we established new control points and confirmed alignment with the DLR grid to support ongoing improvements and maintenance.

Survey control reinstatement at West Silvertown DLR station West Silvertown: network continuity confirmed.

King George V Station

At King George V, we reinstated and checked control, documenting ties to physical features so future teams can re-occupy quickly and accurately.

Survey control reinstatement at King George V DLR station King George V: reinstated control with witness ties.

Witness Diagrams & QA Reporting

We supplied witness diagrams, coordinate schedules and AutoCAD drawings with QA summaries, giving TfL a durable record for future re-establishment and audits.

Witness diagrams and QA reporting for DLR survey control reinstatement Witness packs and QA documentation for TfL records.

Results

  • Control reinstated at three DLR stations: Westferry, West Silvertown, King George V.
  • Redundant check observations verified network integrity.
  • Witness diagrams, coordinates and AutoCAD drawings supplied.
  • Reliable control for ongoing improvements and maintenance.

Send us a message