Site Engineering

Responsive site engineering for construction: survey control, setting out, dimensional QA and coordination to keep programmes on track.

Site Engineering hero image

What is Site Engineering?

Site Engineering is the practical, day-to-day application of surveying, setting out and dimensional control that keeps construction aligned with design. Triple Survey provides engineers who coordinate across trades, control interfaces and maintain accurate, traceable records.

Why it matters

With many teams working simultaneously, small dimensional errors can cascade into clashes, delays and claims. Dedicated site engineers protect programme certainty by controlling survey references, managing set-out requests and verifying critical elements.

How we deliver

We establish or verify survey control, manage daily setting out, undertake dimensional QA and produce AutoCAD updates. Communication with PMs, designers and subcontractors ensures safe, clash-free construction.

Where we operate

Commercial and residential developments, healthcare and education estates, industrial and infrastructure projects, live and constrained environments.

What we deliver

  • Full-time or part-time site engineering cover
  • Set-out request management and trade coordination
  • Dimensional QA, inspections and check sheets
  • AutoCAD mark-ups and progress/as-built records

FAQs

They manage set-out requests, maintain survey control, verify dimensions and levels, record QA evidence and coordinate with trades and designers.

Yes — we can embed engineers on site full-time or provide part-time/rota cover.

By preventing dimensional errors, maintaining references and resolving clashes early so trades can continue without delay.

Yes — we work within your RAMS, permits and processes and can produce survey-specific method statements.

We can provide daily notes and weekly summaries including progress, issues and actions.

Leica TS16 total stations, Leica GS18t GNSS, digital levels and CAD validation by our office-based engineers.

Yes — staged as-builts and final records in CAD with schedules and photo QA.

Yes — we can re-check or re-establish control and review historic QA before continuing.

Typically within 24 hours UK-wide, subject to access and safety documentation.

Latest approved drawings/models, coordinate system, benchmarks, tolerances, programme and access constraints.

Send us a message