Triple Survey was appointed to provide comprehensive site engineering support during the renovation of St Mary’s Hospital, Paddington (London). Our scope included setting out column positions, threshold levels, interpretation of 3D drawings, as-built surveys, verticality checks and production of detailed AutoCAD reports comparing design to built.

Column setting out Threshold levels 3D drawings & BIM As-built & QA Verticality checks
St Mary’s Hospital Paddington renovation — site engineering and setting out by Triple Survey

Project Overview

Working in a live hospital environment demanded precise coordination and traceable accuracy. We established survey control, translated 3D design information into field-ready data, and provided setting out for critical elements including column centres and threshold datums. We validated construction through as-built surveys, verticality checks and design-to-built comparisons to support quality assurance and stakeholder sign-off.

  • Leica TS16 & GS18t with robust control & calibration.
  • 3D drawings/BIM interpretation to create survey-ready coordinates.
  • AutoCAD deliverables: drawings, mark-ups, schedules & deviation reports.
  • Verticality and threshold level checks to specification tolerances.

At a Glance

  • Sector: Healthcare / Refurbishment
  • Services: Setting Out, As-Built, 3D Interpretation, QA
  • Equipment: Leica TS16, Leica GS18t
  • Software: AutoCAD; BIM collaboration

Establishing Column Grid & Control

We established a reliable control network aligned to the project grid, allowing accurate setting out of column centres and interfaces. Control checks were logged daily and supplied within the QA pack.

Setting out column grid and control at St Mary’s Hospital, Paddington Setting out column grid and establishing survey control.

Setting Out Column Centres

Using the approved grid, our engineers positioned column centres to mm-level tolerances, issuing coordinate schedules and check shots to validate positions prior to fix and pour.

Setting out column centres with Leica total station — St Mary’s Hospital renovation Column centres set out and verified prior to fixings.

Threshold Levels & Access

We controlled threshold levels and falls at doorways and interfaces, ensuring compliance with accessibility and drainage requirements while coordinating with existing finishes.

Threshold level checks and datums at St Mary’s Hospital, Paddington Threshold datums and compliance checks.

Interpreting 3D Drawings & BIM

Our team extracted coordinates and levels from 3D drawings (e.g., Revit/IFC), converting them to field-ready data for instruments. We maintained traceability from model element to on-site mark-out.

Interpreting 3D drawings and BIM data for setting out — St Mary’s Hospital 3D model interpretation for setting out data.

As-Built Surveys & Comparison

We captured as-built geometry at key stages and compared measurements to design intent, reporting deviations with clear mark-ups and tables to assist decision-making.

As-built survey capture and AutoCAD comparison — St Mary’s Hospital As-built capture for design-to-built analysis.

Verticality Checks

We undertook verticality checks on structural elements, documenting out-of-plumb values and recommending adjustments to maintain tolerance and alignment across floors.

Verticality checks and QA reporting — St Mary’s Hospital renovation Verticality assessment and reporting.

AutoCAD Reporting & Schedules

Our AutoCAD team produced coordinated drawings, coordinate schedules, level sheets and deviations tables, streamlining approvals with clear, construction-ready outputs.

AutoCAD reporting, mark-ups and schedules for renovation — St Mary’s Hospital AutoCAD drawings, mark-ups and schedules.

Design Team Coordination

We worked closely with the architects and structural engineers to resolve queries quickly, updating models and drawings with verified field data to support design coordination.

Coordination with design team and model updates — St Mary’s Hospital Paddington Close collaboration with the design team.

Working in a Live NHS Environment

We planned access, segregation and out-of-hours tasks to minimise disruption, maintaining hospital operations while keeping survey accuracy and traceability front-and-centre.

Live hospital working procedures and access planning — St Mary’s Hospital Access planning and safe segregation on site.

Final Records & Handover

We delivered a complete handover pack: as-built drawings, coordinate lists, verticality and level reports, and photographic QA — providing a robust permanent record for the estate.

Final as-built records and QA handover — St Mary’s Hospital renovation Complete as-built and QA handover pack.

Results

  • All column positions and threshold levels set out and verified.
  • As-built and verticality reporting delivered for QA and sign-off.
  • Clear design-to-built comparisons supporting rapid decision-making.
  • Coordinated AutoCAD deliverables for records and BIM integration.